Client Contractor: PIHL Hourie
Consultant: Dar al Handasa JV Selhorn Dahnt
Reference: Eng. Labib Nader- Hourie Eng. Antony Allouf- Hourie
Flanges that had special grade were ordered specifically for this project.
This project involved plasma cutting and drilling 45 mm thick plates.
Welding of grade 70 rebar to grade 50 steel plates.
Tightening and fitting of rebar to spiral stirrups.
We delivered 574 piles in total and the project duration was 9 months.
Consultant: Dar al Handasa JV Selhorn Dahnt
Reference: Eng. Labib Nader- Hourie Eng. Antony Allouf- Hourie
Our company manufactured steel cages, for the underwater piles, that were cast to form a support for the new quay deck.
The steel cages were made of reinforcement bars that were welded to steel flanges.Flanges that had special grade were ordered specifically for this project.
This project involved plasma cutting and drilling 45 mm thick plates.
Welding of grade 70 rebar to grade 50 steel plates.
Tightening and fitting of rebar to spiral stirrups.
We delivered 574 piles in total and the project duration was 9 months.